Onicon F-2600 Manual do Utilizador Página 23

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 131
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 22
11451 Belcher Road South, Largo, FL 33773 • USA • Tel +1 (727) 447-6140 • Fax (727) 442-5699 • [email protected]
F-2600 & F-2700 Vortex Flow Meter Manual 02/15 - 0808-7 / 19204 Page 23
2.2.2 Flange-Style Flow Meter Installation
Install the ange-style meter between two conventional pipe anges of the same nominal
size as the ow meter. If the process uid is a liquid, make sure the meter is located where
the pipe is always full. This may require locating the meter at a low point in the piping
system. Note: Vortex ow meters are not suitable for two-phase ows (i.e., liquid and gas
mixtures). For horizontal pipelines having a process temperature above 300° F, mount the
meter at a 45° or 90° angle to avoid overheating the electronics enclosure. To adjust the
viewing angle of the enclosure or display/keypad, see page 34 and 35.
Figure 7. Flange-Style Flow Meter Installation
!
CAUTION
When using toxic or corrosive gases, purge the line with inert gas for a minimum of four hours at
full gas ow before installing the ow meter.
When installing the meter make sure the ange marked with a ow arrow is positioned
upstream of the outlet ange, with the arrow head pointing in the direction of ow. (The
mark is on the ange adjacent to the enclosure mounting neck.) This ensures that the
sensor head is positioned downstream of the vortex shedder bar and is correctly aligned to
the ow. Installing the meter opposite this direction will result in completely inaccurate
ow measurement. To install the meter:
1. Conrm that the installation site meets the required minimum upstream and
downstream pipe diameters. Turn off the ow of process gas, liquid or steam. Verify
that the line is not pressurized.
2. Seat the meter level and square on the mating connections with the ange stamped
with a ow arrow on the upstream side, with the arrow head pointing in the direction
of ow. Position a gasket in place for each side. Make sure both gaskets are smooth
and even with no gasket material extending into the ow prole. Obstructions in the
pipeline will disturb the ow and cause inaccurate measurements.
3. Install bolts in both process connections. Tighten the nuts in the sequence shown in
Figure 5. Check for leaks after tightening the ange bolts.
Vista de página 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 130 131

Comentários a estes Manuais

Sem comentários